WELCOME TO

21750 Pineywood Loop

One or more photo(s) has been virtually staged. Pre-Construction. To be built. Estimated Completion late spring 2026!
View Data room

About This Project

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Suspendisse varius enim in eros elementum tristique. Duis cursus, mi quis viverra ornare, eros dolor interdum nulla, ut commodo diam libero vitae erat. Aenean faucibus nibh et justo cursus id rutrum lorem imperdiet. Nunc ut sem vitae risus tristique posuere.

Location
Land O' Lakes, Florida
Units
1
Status
Pre-Construction

Parcel Details

Lot Address: 21750 Pineywood Loop
City:
 Land O' Lakes, Florida
Zip Code:
34639
Lot Size:
0.29 Acres
Unit Size:
1,474 SQFT
Build Date:
2026

This thoughtfully designed residence offers approximately 1,474 sq. ft. of open-concept living space featuring 3 bedrooms and 2 baths, ideal for modern family living. The spacious floor plan flows seamlessly from the living room into the kitchen and dining area, perfect for everyday living and entertaining. Enjoy abundant natural light, quality construction, and energy-efficient features throughout. Buyers have the opportunity to personalize select finishes and options. If a deposit is received by May 1st, the builder will include a built-out patio at no additional cost. Conveniently located with easy access to local amenities. Photos are for illustration purposes only; home to be built. Contact today for details, timelines, and customization options.

Project Description

21750 Pineywood Loop in Land O’ Lakes, Florida is a high-conviction modular infill opportunity in one of the fastest-growing pockets of the Tampa Bay metro, positioned near major commuter corridors and everyday retail while still feeling distinctly residential. The plan is to deliver a high-quality, financeable single-family home using our modular construction platform: bringing modern design, strong curb appeal, and energy-efficient performance that fits seamlessly with surrounding homes.

This project reflects our repeatable model: acquire well-located lots at disciplined basis, deploy a standardized modular build to reduce construction volatility, and compress timelines through off-site fabrication and streamlined on-site execution. The result is a scalable approach to delivering attainable, desirable housing in supply-constrained submarkets: designed to protect downside through controlled costs and to drive upside through speed-to-market and consistent product quality.

WORKING PROGRESS

Development Milestones
and Key Dates

May, 2025

During this phase the property is secured either through contract or closing, feasibility studies are completed, zoning is confirmed or adjusted if necessary, and preliminary architectural and civil plans are developed. The project budget and financial projections are finalized to confirm viability before moving forward.

June, 2025

This includes clearing and grading the land, conducting soil testing and compaction, installing utilities such as water, sewer, and electrical, and preparing road access and drainage systems. The site is fully prepared for construction to begin.

July, 2025

The foundation is poured, framing is completed, roofing and exterior systems are installed, and mechanical, electrical, and plumbing systems are put in place. Interior build out begins as the structure moves toward completion.

August, 2025

Final inspections are conducted, permits and approvals are secured, and a certificate of occupancy is obtained. Landscaping and exterior finishes are completed, and the property is prepared for lease, sale, or occupancy, marking the transition into revenue generation or project stabilization.

No milestones.
Discuss This Investment Opportunity
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Citrus Glen Capital

Explore Modular Home Opportunities

Scalable modular housing solutions built for long-term value.